Airfix GMR (Great Model Railways) OO LMS Period III (1978)

Airfix GMR (Great Model Railways) OO LMS Period III (1978) Unpowered

Model overview

9355 at Highley on the Severn Valley Railway in March 2009. ©Duncan Harris 9355 at Highley on the Severn Valley Railway in March 2009. ©Duncan Harris
LMS Period III
Scale: OO Gauge (1:76 Scale)
Manufacturer: Airfix GMR (Great Model Railways) - Manufacturer Profile
First Introduced: 1978
DCC Capability: Unpowered

pr

Products from this Tooling


Other OO Gauge (1:76 Scale) LMS Period III models

Products awaiting categorisation

Scale Brand Image Construction Type DCC Capability Product Code Product Title Livery
OO Gauge (1:76 Scale) Airfix GMR (Great Model Railways) KB1211 LMS Period 3 SK second corridor in BR carmine & cream M2028M - built from multiple coaches with Keen couplings fitted Not set Unpowered KB1211
View
LMS Period 3 SK second corridor in BR carmine & cream M2028M - built from multiple coaches with Keen couplings fitted Not Applicable